Monday, November 16, 2009

Almost at lock-up!!

The site supervisor has told us that the house should be locked up today! Which is exciting but bad because then we I can't go in anytime. We should have a roller door and a front door by now. The next two days the kitchen is being installed. Floorboards are being delivered next week to live in the garage until we are ready to lay them (thanks Dad!)
Bathroom:
Laundry:

Cabinetry for the kitchen:


More kitchen cabinetry ready to be installed:


Front door! This wil be painted red:

Shower in ensuite:

Ensuite:


Rainwater tap from the tank:


Tank:

Tank:











1 comment:

  1. All looking great, guys.
    Not too much longer to go...I love the brick choice on your house.
    Take care,
    John & Tarin

    ReplyDelete